Free NOV Survival Guide: What to do in the first 72 hours after a violation. Get the guide
Stormwater Division

Stormwater & SWPPP Compliance

SWPPP plans, inspection programs, NOV response, turbidity management, and BMP installation — everything your active site needs to stay compliant with FDEP.

Florida stormwater violations can carry penalties reaching tens of thousands of dollars per day, plus stop-work orders and delayed COs. Don't risk it.

The Law Is Specific

Active construction sites in Florida typically require inspections at least every 7 days and within 24 hours of a 0.5" rain event. Our compliance programs are built around those requirements so your site stays inspection-ready.

If your site disturbs one or more acres, you need a SWPPP, a CGP, and someone doing compliant inspections on cadence. Anything less is a violation waiting to happen.

Why This Matters Now: SB 7040

With Florida's SB 7040 stormwater rule now in effect, FDEP and local MS4s are stepping up enforcement for both new and ongoing construction projects across Central Florida. Sites that were previously low-priority are now getting inspected. If your compliance documentation isn't current, the risk of enforcement action is higher than it's been in years.

Not ready for a walkthrough yet? Start with the free NOV Survival Guide.

What We Do

SWPPP Inspection Retainers

Weekly CGP-compliant inspections with same-day reports, BMP assessment, corrective actions, and storm-event coverage. The core of your compliance program.

SWPPP Plan Development

Site-specific plans that meet CGP requirements. Includes BMP design, inspection schedules, and responsible-party documentation.

NOV Response & Recovery

When FDEP finds a violation, we build a corrective action plan, revise your SWPPP, execute remediation, and handle agency correspondence.

ERP Recertification

Annual compliance recertification for ERP-regulated stormwater systems — ponds, BMPs, and outfall structures.

BMP Installation

Our field crews install and maintain silt fences, inlet protections, stabilized entrances, and sediment basins. No subcontractors needed.

NOI/NOT Filings

Notice of Intent before construction begins, Notice of Termination when permanent stabilization is achieved. We handle the paperwork.

SWPPP Inspection Retainers

Ongoing inspections and reports that meet the every-7-days + post-storm cadence required by Florida's CGP. Tiered by site size and complexity.

Full Compliance Program

Active Sites

Meets Florida's every-7-days + 24-hour post-0.5" rain inspection requirements for active NPDES sites.

Starting at

$850/mo per site

  • Weekly CGP-compliant SWPPP inspections
  • Same-day digital reports with photos
  • BMP assessment & corrective action list
  • FDEP-ready documentation and SWPPP log entries
  • Up to 2 storm-triggered inspections per month included
  • Turbidity monitoring (NTU readings at outfalls) included
  • Coordination with your GC, engineer, and regulator

Final pricing depends on site acreage, discharge points, and complexity. We walk the site and quote after the walkthrough — never blind.

Schedule Free Walkthrough

Multi-Site Programs

For GCs and developers running 3+ active sites. Volume pricing, consolidated reporting, and a dedicated account manager.

Request Proposal

Other Stormwater Services

SWPPP Plan Development

Starting at $2,500

New SWPPP plan for CGP coverage. Price depends on site acreage and complexity.

NOV Response & Recovery

Starting at $1,750

Corrective action plan, SWPPP revision, agency correspondence, and follow-up. BMP implementation billed separately.

ERP Recertification

Starting at $750

Annual compliance recertification for ERP-regulated stormwater systems.

NOI / NOT Filings

Starting at $400

Permit filing assistance for Notice of Intent or Notice of Termination.

All physical BMP work (silt fence, inlet protection, etc.) fulfilled by our field crews and billed separately. Schedule a walkthrough for a custom quote.

Our Guarantees

On-Time Report Guarantee

If we ever miss a scheduled inspection or fail to deliver the report within 24 hours, we credit your next month of retainer fees. Client must provide site access as scheduled.

Documentation Defense Promise

If a regulatory agency questions something we documented as compliant, we handle all follow-up paperwork and agency correspondence at no additional fee. Client must have implemented our corrective actions within the deadlines we set.

Example Scopes We Handle

These are representative project types — not past client projects.

5-Acre Commercial Site

Volusia County

SWPPP plan development + 6-month inspection retainer + 2 storm-event responses.

20-Acre Subdivision

Seminole County

Construction SWPPP, weekly inspections for 12 months, and CGP permit close-out support.

40-Acre Mixed-Use

Orange County

Phased SWPPP program, high-risk site monitoring near OFW, NOV prevention retainer.

Got a violation?

If you already have an NOV or stop-work order, skip the walkthrough. Go straight to NOV Emergency Response.

Talk to Us About Your Site

We walk the site before we quote. Schedule a free compliance walkthrough and we'll tell you exactly what your site needs — no obligation.

Our Certifications

Clearmark inspections are performed by certified professionals. These are the credentials behind our work.

FESCI

Florida Erosion & Sediment Control Inspector

NPDES QP

NPDES Qualified Person

OSHA 30-Hour

OSHA 30-Hour Construction Safety

Call Us Free Walkthrough